It's the final walk before a new resident arrives. The apartment is clean, the paint is dry and the lights work. Maintenance has finished its work orders. Leasing still needs to confirm when the resident's electric account starts. Track those checks separately on the make-ready board. A finished repair shouldn't close an unfinished account handoff.
What belongs on a utility-ready make-ready checklist?
A make-ready checklist tracks the work that prepares a vacated apartment for its next resident. It usually brings inspection, repairs, cleaning and final checks into one record. For utilities, record whether service works and equipment has been checked. Confirm who holds the account too.
We suggest the workflow below as an addition to your property's full turn process. It isn't a national rent-ready standard. The National Renewable Energy Laboratory's (NREL) 2015 public-housing turnover checklist supplies useful maintenance examples. It uses complete and not-applicable fields. It guides public housing work. It doesn't set rules for every private apartment.
Copy the applicable rows into your existing board. The timing and task owners below are our suggested assignments. Add the person's name, a completion date and a reason for anything marked not applicable.
Scroll sideways to see all columns →
| Utility task | When to check | Evidence to keep | Suggested task owner |
|---|---|---|---|
| Confirm the exact unit, fuel and account | When the turn opens | Record the service address, unit, utility and current bill payer. | Property manager |
| Confirm service is available | Before powered maintenance checks | Keep utility confirmation or an open order to start service. Check service on site too. | Manager and qualified maintenance lead |
| Record accessible meter details | During the inspection, when safe and permitted | Keep the meter ID and a dated photo. Add a reading if safe to get. | Assigned inspection staff |
| Complete applicable powered checks | During maintenance and final inspection | Record results, work orders and any faults still open. | Qualified maintenance staff |
| Resolve utility exceptions | Before closing the utility task | Name a person for follow-up. Keep the utility response and next step. | Property manager |
| Confirm incoming account start date | Before completing the account handoff | Keep proof of setup or verification and the actual start date. | Leasing or property manager |
| Sign off utility readiness | At the final review | Keep separate maintenance and account checks. Add dates and names. | Assigned final reviewer |
Use the table for the systems your property actually has. A central hot-water plant belongs in the building's maintenance records. A resident-paid electric meter needs an account handoff. An owner-paid unit needs confirmation that its continuing account matches your arrangement. Marking a row not applicable should explain which arrangement applies.
Who holds the electric account during the turn?
Check the utility's billing record and the exact enrolled premise. An agreement can keep service with the landlord between residents. ComEd's master agreement, checked November 8, 2026, provides continuous service after a tenant cancels. Its current public portal page also offers real-time billing-responsibility information.
Use that record to establish who's responsible during the turn. Then check the incoming resident's start date separately. The broader explanation of who holds the electric account between residents covers the handoff itself.
Enrollment and activation also need separate checks. Con Edison's Leave on for Landlord FAQ, checked November 8, 2026, says enrollment won't automatically activate an unused meter. Ask your utility whether the unit has an outstanding activation order, and assign someone to resolve it. An agreement record alone doesn't complete the service check.
What meter information should the team record?
We suggest keeping the accessible meter ID with the exact service address and unit number. Add a dated photo and read where safe and permitted. NREL's checklist starts with the address and apartment number. Use those same details in your utility records.
A photograph is a reference for follow-up. It doesn't prove who owes the bill or which unit the meter serves. If labels or utility records conflict, record the mismatch and ask the utility to investigate. Keep meter seals and utility enclosures untouched.
Which turn checks need working power?
Lighting and powered equipment need working service before qualified staff can confirm operation. NREL's 2015 checklist includes light bulbs and filters for air-conditioning and air handlers. It also checks hot-water temperature and airflow from bath and kitchen exhaust fans. Use those as task categories, adapted to your building's actual equipment.
Lighting and exhaust fans. Have qualified maintenance staff follow site procedures and record the result. A failed check should leave an open work order with someone assigned to it. Keep the final review tied to the completed repair and recheck.
Heating, cooling and hot water. Identify the equipment and fuel first. Working electricity alone doesn't confirm a gas system or central plant is ready. Use qualified staff and equipment instructions for applicable checks, including any temperature check. This checklist supplies no universal temperature setting.
Professional maintenance. A turn inspection doesn't replace the equipment's maintenance program. The US Department of Energy's Home Energy Checklist was checked November 8, 2026. It recommends professional furnace or heat-pump maintenance each year. Keep that work in your maintenance schedule alongside the unit-turn record.
Utility readiness is one part of the complete property inspection. Confirm local rules through your property's inspection process. Use them when deciding if a unit is ready for a resident.
How do you add utility readiness to the make-ready board?
Give service, maintenance and incoming setup their own evidence fields. Then assign one person to review the handoff. We suggest this sequence:
Open the utility record with the turn. Record the exact unit, utility, fuel and who currently holds the account. Mark tasks applicable or not applicable with a reason.
Confirm working service before testing. Check agreement enrollment and any activation order with the utility. Give unresolved service work a named follow-up owner.
Record the maintenance result. Qualified staff should follow site and equipment procedures. Keep incomplete tests open until service is available and faults are resolved.
Prepare the incoming account handoff. Use the exact service address in resident instructions. You can adapt the guidance to send utility setup instructions before move-in.
Check the actual start date. Compare completed setup or verification evidence with the planned move-in date. Keep an application still in progress open for follow-up.
Review the evidence together. Have the final reviewer check service, maintenance results and who holds the account separately. Record the date and the person who closed each item.
How Public Grid helps
A finished turn needs a clear incoming account handoff. Public Grid gives your team one move-in link to send from the property page. We set up the resident's utility account so the account moves off the owner. Owners, property managers and residents can use Public Grid for free.
The portal puts the account check beside each unit's start service date. Pending Setup means sign-up or verification is in progress. Utility Verified means the utility account has been verified. Use those statuses to decide which setup needs follow-up. Maintenance keeps its own inspection record.
Your team can compare the start date with the lease and keep the result in the turn record. You can also export unit statuses and start dates to Excel for the handoff review. Start by checking electricity coverage for your property with its address, then use the move-in link for your next resident.
Common questions
Does power being on mean the resident's utility account is ready?
No. Working lights show that electricity is available at that moment. They don't show who's paying. ComEd's Property Manager Portal shows who pays the bill. Compare that account record and the next service start date with your move-in records.
How long should an apartment make-ready take?
Set the schedule from the work your unit needs and the people available to complete it. The sources used here don't set a standard time for this work. Keep utility activation and unresolved powered checks visible on your board rather than marking them complete to meet a target.
Can you finish a make-ready without active electricity?
You can complete work that doesn't require power, but leave powered checks open until qualified staff can perform them safely. The National Renewable Energy Laboratory's turnover checklist includes lighting and exhaust-fan checks. If a unit has no working service, assign someone to call the utility. Keep maintenance follow-up assigned too.
Sources
- NREL: Measure Guideline, PHA Energy-Efficient Unit Turnover Checklist (2015)
- ComEd: Landlord/Property Manager Master Agreement (checked November 8, 2026)
- ComEd: Manage your properties for uninterrupted service (checked November 8, 2026)
- Con Edison: Leave on for Landlord FAQ (checked November 8, 2026)
- US Department of Energy: Home Energy Checklist (checked November 8, 2026)