Skip to content
BlogMove-ins & move-outs

Move-in checklist for landlords, with the utility steps

A printable checklist for apartment leasing teams that runs from lease signing to the first week, with the reason behind every line.

It's the first of the month, and three residents are at the leasing desk for keys. The leases are signed and the deposits are in. One condition form is still blank, and nobody has asked one of the residents when their electric service starts. A month later, the owner is still paying for that unit's power.

What a move-in checklist for landlords includes

A move-in checklist for landlords is the leasing office's list of what to finish before and after a resident gets keys. Print the table for each resident's file.

Check the timing rules for your state and housing program first. Some inspections and condition records must be completed before you sign the lease or collect a deposit.

Scroll sideways to see all columns →

StageWhat to doWhy it's on the list
Before signing or collecting a deposit, where requiredCheck your state's and housing program's inspection timing. Complete the condition record before signing or collecting a deposit when required; otherwise complete it by the applicable move-in deadline. Walk the unit together, take dated photos, sign the report and give the resident a copy.Some states require it, and it's your baseline at move-out. In Georgia and at HUD-subsidized properties, do it before the deposit or lease.
Before lease signingGive the lead disclosure if the building was built before 1978, and any disclosures your state or city requiresUnder a federal rule, the Environmental Protection Agency (EPA) pamphlet and your disclosure come before the lease binds the resident. Keep the signed copy at least 3 years. New York, for one, requires flood-history notice in every residential lease.
Lease signingSign the lease and collect the deposit and first month's rentCollect only what your state allows. California and New York cap most deposits at one month's rent, and Arizona at one and a half months'.
Lease signingGive a deposit receipt when you take the deposit, if your state requires oneMassachusetts, for one, requires a signed receipt at the time you take the deposit. Maryland's receipt must also explain the resident's inspection rights.
Lease signingList which utilities the resident sets upYour lease decides the split. Residents can't start service they don't know about.
Before keysCollect renters insurance proof, if your lease requires itWhether you can require it depends on your state and, at properties subsidized by the U.S. Department of Housing and Urban Development (HUD), on HUD approval.
Before keysConfirm the utility start date matches the leaseUnder a landlord agreement like ComEd's, the owner is billed until service starts. Without one, Con Edison turns service off when a tenant closes the account.
Before keysRekey locks, change codes and test the smoke alarmTexas, for one, requires a working smoke alarm at the start of possession and rekeying by the seventh day after the new resident moves in.
Move-in dayPhotograph the meter number and readingA dated reading helps you check an estimated bill, which some utilities send in months they don't read the meter. This is our suggestion: no utility page we checked asks landlords to record the meter at move-in.
Move-in dayCheck that the unit left the owner's account once the resident's service startsOtherwise the owner may keep paying for the unit's power, as under a landlord agreement like ComEd's.
Move-in dayHand over keys, fobs and the welcome packetThe packet tells residents who their utilities are.
First weekCollect the resident's returned condition report and any damage they addSeveral states give residents a set window to list damage. The ones we found run 5 to 15 days. Massachusetts gives you 15 days to return a signed copy of the resident's list, agreeing or noting disagreement.
First weekRecheck that the unit left the owner's accountSame reason as the move-in day check.
First weekAt HUD-subsidized properties, schedule repairs noted at the inspectionHUD's handbook sets the completion date no more than 30 days after the lease's effective date.
First weekFile the lease, report, photos, disclosures and insurance proofYou may need them years later. Massachusetts requires keeping the condition statement for two years after the tenancy ends.
First 30 daysSend any deposit receipt your state requiresMassachusetts also requires a second receipt naming the bank and account within 30 days.

Treat the stages as a working order. Some states set when the condition record has to happen, sometimes tied to when you take the deposit. In Georgia, and at HUD-subsidized properties, the condition record comes before the deposit or the lease. Legal details here are as of November 2026.

When a move-in checklist is required by law

It depends on the state. As of November 2026, some states require a written condition record. Others require a report, an offer or photos, and HUD-subsidized properties have their own rule. These are examples, and cities can add rules, so check with counsel.

States that require a written record

Washington ties it to the deposit. Under RCW 59.18.260, you need a written lease to collect a deposit. The resident must also get a written checklist when the tenancy starts. Collect a deposit without it, and you're liable to the resident for the deposit amount.

Georgia puts the list before the deposit. Under O.C.G.A. § 44-7-33(a), the resident gets a list of existing damage before paying the deposit and may inspect the unit before moving in to check it. You both sign the list.

Massachusetts requires a written statement of condition, with the notice wording the statute sets, if you take a deposit. It's due within 10 days of the tenancy starting, or when you receive the deposit, if that's later. You can only collect a security deposit if you give this statement and hold the deposit as the law requires (Chapter 186, section 15B).

Michigan requires inventory checklists at the start and end of each tenancy with a deposit (MCL 554.608).

Arizona requires a move-in form for existing damage (A.R.S. § 33-1321). It also requires a signed copy of the lease and notice that the resident may attend the move-out inspection.

States with a different rule

Virginia puts the report after move-in. Under Va. Code § 55.1-1214, you give a written report of existing damage within five days of occupancy. It stands unless the resident objects in writing within five days.

New York requires an offer. Under General Obligations Law § 7-108, you must offer a joint inspection after lease signing and before move-in. If the tenant asks for one, you both sign a written condition agreement. You then can't keep deposit money for anything it notes. Rent-stabilized units are covered by a separate section, § 7-107, which has required the same inspection offer for leases signed or renewed since mid-November 2025. Rent-controlled units and some senior and assisted-living housing are exempt.

Maryland lets the resident ask. Under Real Property § 8-203.1, the deposit receipt must say they can request an inspection and damage list. They ask by certified mail within 15 days of moving in.

California requires photos. For tenancies starting on or after July 1, 2025, Civil Code § 1950.5 requires photos of the unit. Take them immediately before or when the tenancy starts.

HUD-subsidized properties

HUD's Handbook 4350.3 requires owners of subsidized multifamily properties to inspect each unit with the resident before the lease is signed. Both sign and date the form, and it becomes a lease attachment. The handbook doesn't cover public housing or Housing Choice Vouchers.

For a Housing Choice Voucher move-in, the housing authority usually inspects the unit and approves the tenancy first, and the lease needs HUD's tenancy addendum. Ask the housing authority for its timeline.

Where no rule applies, or you take no deposit, keep the record anyway.

How to handle the utility steps

Turn "set up utilities" into checks the team can finish.

  1. Write down who sets up what, per the lease. If the owner keeps the electric account, skip steps 2, 3 and 5. That's the case in a master-metered building, or one billed through submeters or a ratio utility billing system (RUBS). In step 4, record the submeter reading, if there is one.

  2. Confirm the start date matches the lease. PSE&G's form asks for "The date you’d like to start service," and Con Edison asks for "Your move-in date." Ask the resident which date they gave. For timing, use a reminder schedule that fits utility lead times. If residents pay for gas, confirm that date too; gas starts can need a technician visit.

  3. Check that the unit left the owner's account. Whoever holds the owner's utility login or landlord agreement can check. ComEd's property manager portal, for example, lets landlords "View real-time billing responsibility." Elsewhere, ask about the utility's landlord or revert-to-owner program. In Texas's competitive areas, ask the owner's retail electric provider instead. Do the same for gas if residents pay it. See how the electric account moves to a new resident.

  4. Photograph the meter at handover. No utility page we checked asks landlords to record the meter at move-in, so this is our suggestion. A dated reading helps when a bill is estimated. PSE&G, for one, marks bills "estimated" in months it doesn't read the meter. Where a smart meter records actual use, as Con Edison's do for final bills, the photo matters less.

  5. Follow up on move-in day if service hasn't started. Ask the resident to start service with the utility and send you the confirmation.

How Public Grid helps

From the property page in the Public Grid portal, choose "Send move-in link" and paste in resident emails. Residents sign up through the link, and Public Grid sets up their utility account so it moves off the owner. Residents don't pay for the service.

The portal shows each unit's status. Pending Setup means sign-up or verification is still in progress, so follow up before keys. Utility Verified means we've verified the utility account, and Bill Upload Verified means a verified bill is on file. Each unit also shows its start service date to compare with the lease.

Confirm the owner's side with the utility, as in step 3. You choose when the move-in link goes out.

Public Grid works with ComEd, Con Edison, PSE&G and other utilities. To check a building, enter the property's address to see electricity coverage.

Common questions

How long does a tenant have to return a signed move-in checklist?

It depends on the state. As of November 2026, Massachusetts gives residents 15 days to return the condition statement and Michigan gives 7 days. Virginia gives 5 days to object to the landlord's report. HUD-subsidized properties allow 5 days to report more problems. Check your state's statute.

Can a landlord require renters insurance?

It depends on your state and program. Virginia's statute, for one, lets a landlord require it as a condition of tenancy, and a resident who buys their own policy must give written proof. At HUD-subsidized properties, an owner's lease addendum needs HUD or Contract Administrator approval first. Check with counsel.

Can I use the same checklist at move-out?

Yes. Use the signed move-in record as your baseline. Michigan requires inventory checklists at the start and end of each tenancy with a security deposit. In New York, a landlord can't keep deposit money for anything noted in the move-in agreement, so compare against it before any deduction.

Sources

  1. California Legislative Information: Civil Code § 1950.5 (as amended by AB 414, effective Jan. 1, 2026)
  2. New York State Senate: S6458 (2019), Housing Stability and Tenant Protection Act, Part M § 25
  3. Arizona Legislature: A.R.S. § 33-1321, Security deposits
  4. Massachusetts Legislature: General Laws, Chapter 186, Section 15B (amendments effective Aug. 1, 2025)
  5. Maryland General Assembly: Real Property § 8-203.1
  6. eCFR: 40 CFR 745.107, Disclosure requirements for sellers and lessors
  7. eCFR: 40 CFR 745.113, Certification and acknowledgment of disclosure
  8. New York State Senate: Real Property Law § 231-B (revision of June 23, 2023)
  9. HUD: Handbook 4350.3 REV-1, Chapter 6, Lease requirements and leasing activities (Change 4)
  10. ComEd: Manage your properties for uninterrupted service (property manager portal)
  11. Con Edison: Leave on for Landlord Program
  12. Texas Legislature: Property Code, Chapter 92 (§§ 92.151, 92.156, 92.258)
  13. Georgia General Assembly: HB 687 (2025, not enacted), whose non-underlined text is current O.C.G.A. § 44-7-33(a)
  14. Washington State Legislature: RCW 59.18.260, Deposits and written checklist (2023)
  15. Michigan Legislature: MCL 554.608, Inventory checklists
  16. Code of Virginia: § 55.1-1214, Inspection of dwelling unit; report
  17. New York State Senate: S952-B (2025), enacted as Chapter 436 of 2025
  18. HUD: Handbook 4350.3 REV-1, Chapter 1, Introduction
  19. eCFR: 24 CFR 982.305, PHA approval of assisted tenancy
  20. PSE&G: Start, stop, or transfer service
  21. Con Edison: Start, Move, or Stop Service
  22. Oncor: General questions (FAQ)
  23. PSE&G: Meter reading
  24. Con Edison: How to read your electricity meter
  25. Code of Virginia: § 55.1-1206, Landlord may obtain certain insurance for tenant

GET STARTED

Check electricity availability for your property.It takes a few minutes.

Enter your property's address to see whether we can set up residents' electricity accounts.

Check electricity availability