Skip to content

Chicago energy benchmarking
for apartment buildings

Report energy use each year, have the data checked every three years and display the City's rating. Chicago covers buildings at least 50,000 gross square feet. [1, 2, 3, 4, 5]

Last verified Nov 10, 2026 · 8 official sources

Who is covered

≥50,000 gross ft²[1]

Main duty

Benchmark and disclose[1, 3, 4, 5]

Next deadline

June 1, 2027[1, 4]

Verification cadence

First year / every 3 years[4]

Rating placard

Display upon receipt[3]

Minimum required rating

None[3]

On this page

Which buildings does Chicago cover?

  1. 01

    Confirm gross floor area.

    The City's current page includes buildings exactly 50,000 ft². Check each covered building on its own. Do not add your unrelated properties together. [1]

  2. 02

    Check building use and any exemptions.

    Residential buildings are included. The City lists some uses and situations that may qualify for exemptions. Examples include factories, hazardous-material/storage facilities, certain outdoor uses and financial distress. Others include average physical occupancy below 50%, new construction and ownership changes. These examples do not automatically let you skip reporting. Apply through BEAM and check which year the exemption covers. [1, 2]

  3. 03

    Find the building and verification year.

    Check the City's Covered Buildings List and BEAM inventory. If you need a Chicago Energy Benchmarking ID or a correction, contact the helpdesk. [1, 2, 4]

Prepare your Chicago filing

  1. 01

    Check the building record and contact details.

    Confirm the building record and contact information in BEAM and the covered list. [1, 2]

  2. 02

    Gather the previous calendar year's whole-building energy.

    Include resident-paid electricity and gas, house meters, delivered fuels and on-site generation where they apply. Use ComEd and Peoples Gas services for combined totals where available. [6]

  3. 03

    Complete Portfolio Manager.

    Check floor area, uses, meter units and coverage of the full year. Enter the Chicago Energy Benchmarking ID in the standard city ID field. [6, 7]

  4. 04

    Verify when due.

    Your first report, then every third year, needs verification, a check of the data. Eligible in-house staff or outside professionals can do this. The City lists accepted credentials. Complete, sign and keep the Data Verification Checklist. Enter verification details in Portfolio Manager, the energy reporting tool. Provide the checklist on request; you do not routinely upload it. [4]

  5. 05

    Share data through the current web-services process.

    Connect to username ChicagoEnergyBenchmarking. Allow read-only data sharing for the property and all meters, then check receipt and compliance status. Current instructions replace the old data-request-link method. Updates sync in roughly 24 hours after sharing. Sharing alone does not fix missing data. [7]

  6. 06

    Resolve flags, keep records, and display the rating.

    We suggest keeping utility requests, exports, the verification checklist and confirmation. When you receive the current rating placard, post it where people can easily see it. Include the current rating or score in sale or lease ads where required. Heat Disclosure Law exceptions affect ad disclosure. Check whether they apply to you. [3, 4, 7]

Your next deadlines

  1. June 1, 2027

    Annual energy report

    Next annual report, for the prior calendar year. [1]

  2. Upon receipt each year

    Current rating placard

    Post the current placard when you receive it. There is no fixed calendar date for this duty. [3]

Past deadlines and rule changes
  1. July 10, 2026

    Comments close on the City's draft rules update. This deadline does not mean the rules have been adopted. [1, 8]

  2. June 1, 2026

    Current City page expressly identifies the 2026 benchmarking compliance deadline. [1]

Include resident-paid energy and all meters that count

  1. 01

    Request whole-building totals

    Collect monthly energy for the whole property, including accounts tenants pay. ComEd EUDS provides combined electricity totals; Peoples Gas provides combined gas totals. The City's current guide links separate instructions for buildings with fewer than four tenants. Get your utility's current permission instructions. Check that the data covers every service address and fuel. [6]

  2. 02

    Include resident-paid energy

    Include resident-paid energy alongside common-area usage. Check which fuels and accounts are in the utility totals.

  3. 03

    Reconcile each meter once.

    Compare resident-paid records with utility totals and common-area meters. Fill gaps without counting the same energy twice.

What Chicago requires beyond reporting

Chicago requires energy disclosure and a rating. It does not set a minimum ENERGY STAR score or a multifamily EUI cap. Buildings that meet reporting rules get one to four stars. Too little information results in zero stars. Buildings that cannot get a score use source EUI compared with national medians. Source EUI also counts energy used to produce and deliver the building's energy. Some one-to-three-star properties can earn an extra star. They must improve at least ten score points in two reporting years. These rating rules do not require retrofits. [3]

Chicago's payments and penalties

Example: 30 days of violations

Assume an apartment building has one violation lasting 30 days. Floor area is not a multiplier. [3]

First day
$100
Maximum continuing days
29 × $25 = $725
$825 at the stated continuing-day maximum

This uses the City guidance’s maximum continuing-day rate for one violation.

The City's rating guide lists a $100 fine for the first day of a violation. It allows up to $25 for each day the violation continues. Filing your benchmark does not excuse a missing placard. [3]

Check relief and other ways to meet the rules

Use BEAM to request exemptions, record fixes or free verification. The City permits eligible in-house verification. It also recognizes qualifying ENERGY STAR certification if certified data covers at least six months of the reporting year. A low rating alone does not require improvements. [1, 2, 3, 4, 8]

Bring resident-paid usage to your reporting team.

Reconcile resident-paid usage with utility totals for your annual Chicago energy report.

With each resident's permission, Public Grid collects actual monthly in-unit usage where property data sharing is allowed and we handle the resident's account. We export that usage for ENERGY STAR Portfolio Manager, GRESB and BPS or benchmarking reporting. You or your consultant submit the report.

Public Grid is free for owners, managers and residents. Enter your property's address to check electricity coverage.

Unit 305Active

Bills received

STATEMENTUSAGE
Sep 15, 2026Aug 14 – Sep 12471 kWh
Aug 14, 2026Jul 15 – Aug 13618 kWh

Chicago FAQ

Need help with in-unit data?

Talk with our team about resident permission, usage records and reporting exports.

Book a demoExplore the blog
What is Chicago energy benchmarking?

It requires yearly whole-building energy reports for covered large buildings. Data needs checks on a set schedule, and results are made public. [1, 4]

Do Chicago apartments have to benchmark?

Covered residential buildings at least 50,000 gross ft² are included, subject to exclusions and approved exemptions. [1]

Is verification required every year?

No. The City requires a check for your first report, then every three years. Find your verification year on the covered list. [4]

How do I submit in 2026 and later?

Use Portfolio Manager web-services sharing with ChicagoEnergyBenchmarking. Current instructions have replaced the old report-link method. [7]

Do I need to post the Chicago Energy Rating placard?

Yes. Post it where people can easily see it as soon as you receive it. Sale or lease ads must also show the rating or current score where required. [3]

Does a poor rating mean I must retrofit?

The rating guide encourages improvement; it does not set a required minimum rating. [3]

GET STARTED

Check your property’selectricity coverage.

Enter your property’s address to check electricity service.