Energize Denver
for apartment buildings

Denver covers large buildings at least 25,000 gross square feet, with a separate program for smaller buildings. Owners must report energy use and meet their assigned performance requirements. [1, 2]

Last verified Nov 10, 2026 · 7 official sources

Large-building program
≥25,000 gross ft²

Smaller buildings have a separate program with specified actions to complete. [1]

Main duty
Annual energy reporting

Meet the assigned performance target as well. [1, 2]

Next large-building report
June 1, 2027

Buildings 25,000 ft² and larger; 2026 energy use.[3]

Default multifamily energy target
44.2 kBtu/ft²/year

Assigned targets and approved timing can differ. [1, 5]

Most buildings’ targets

2028 / 2032[2]

Next small-building deadline
December 31, 2026

20,000–24,999 ft².[4]

On this page

Which buildings does Denver cover?

Coverage and next actions
SizeWhat you must do next
25,000 ft² and largerReport 2026 energy by June 1, 2027. Confirm your assigned target and timeline.
5,000–24,999 ft²Follow the small-building route. Buildings of 20,000–24,999 ft² must comply by December 31, 2026.

[1, 3, 4]

  1. 01

    Check size and use.

    Compare the assessor record and building's gross floor area with the large and small thresholds. Multifamily is included. [1, 3, 5]

  2. 02

    Check the reporting configuration.

    Report energy for all uses and tenants in your building. Under stated conditions, an independently run commercial unit may get a separate Denver Building ID (DBID). The owner remains responsible. Check the technical guidance for shared systems and campuses. You cannot simply combine buildings across your portfolio. [1, 5]

  3. 03

    Look up the building.

    Find your large building’s assigned deadlines and targets at lookup.energizedenver.org. For smaller properties, use the Small Building Look Up Tool. Check approved adjustments, extensions or other pathways with Denver’s Office of Climate Action, Sustainability and Resiliency (CASR). [2, 4]

Prepare your Denver filing

  1. 01

    Confirm DBID, target and approved timeline.

    Standard labels in the rules still refer to 2024/2027/2030 targets. The approved extension can move these to 2028/2032; the navigation center describes these as the schedule for most buildings. [1, 2]

  2. 02

    Collect the complete calendar-year energy record.

    Include the whole building's energy use from January through December. Add its floor area, uses, occupancy and operating details. Include any special uses that apply. [1, 3]

  3. 03

    Prepare and check Portfolio Manager.

    Enter DBID and accurate property-use details; connect utility data and account correctly for parking and secondary uses. [1, 3, 6]

  4. 04

    Complete required verification and improvements.

    The first verification, an independent data check, covered 2024 or 2025 data and was due June 1, 2026. Verify again after the final target year. For a 2032 target, that means June 1, 2033. Complete upgrades or your approved plan too. Reporting alone does not meet performance duties. [1, 2]

  5. 05

    Submit through both parts of the workflow.

    Share Portfolio Manager with Energize Denver, claim the building in the Energize Denver Management Portal and submit there. Review confirmation and correct errors. [3]

  6. 06

    Retain evidence and maintain performance.

    Keep required energy-reporting records at least five years. Continue yearly reports after the final year. Eligible renewable-energy or exclusion records are due December 31. Ask for a timeline extension before your applicable target year ends. [1, 2]

Your next deadlines

  1. December 31, 2026

    Small buildings: 20,000–24,999 ft²

    20,000–24,999-ft² small-building compliance; also transitional review requests for decisions before September 2026. [1, 4, 5]

  2. June 1, 2027

    Large buildings: annual benchmarking

    File the annual large-building benchmark for 2026 energy use. [1, 3]

  3. December 31, 2027

    Small buildings: 15,000–19,999 ft²

    Small buildings of 15,000–19,999 ft² must comply. [1, 4]

  4. December 31, 2028

    Small buildings: 10,000–14,999 ft²

    Small buildings of 10,000–14,999 ft² must comply. [1, 4]

  5. December 31, 2028

    Large buildings: assigned interim target

    End of the interim target year for most buildings on approved extended schedules. Confirm your building-specific assignment. [1, 2]

  6. December 31, 2029

    Small buildings: 5,000–9,999 ft²

    Small buildings of 5,000–9,999 ft² must comply. [1, 4]

  7. December 31, 2032

    Large buildings: assigned final target

    End of the final target year for most buildings on approved extended schedules. Confirm your building-specific assignment. [1, 2]

  8. June 1, 2033

    Large buildings: 2032 final-year verification

    Verification and reporting after a 2032 final target year. [2]

Past deadlines and rule changes
  1. September 1, 2026

    Denver issues updated guidance for large-building compliance. [5]

  2. August 27, 2026

    Updated program rules take effect; check your assigned schedule under these rules. [1]

  3. June 1, 2026

    Initial verification of 2024 or 2025 benchmarking. [2]

Include resident-paid energy and all relevant meters

  1. 01

    Request whole-building totals

    Xcel can upload combined whole-building data to Portfolio Manager automatically. September 2026 technical guidance requires tenant consent if there are three or fewer Xcel tenants. It also requires consent if one tenant uses more than 50% of total energy. Other suppliers and delivered fuels have their own records and steps. [4, 5, 6]

  2. 02

    Include resident-paid energy

    Include separately metered electricity and fuels that residents pay for. Ask separately metered tenants and residents for data if utility whole-building data for an energy type is unavailable. You must also ask if you want to check the utility data. They have a duty to provide it. Before a tenant leaves, request that year’s data through their departure. [1]

  3. 03

    Reconcile each meter once.

    Check what the combined utility data and common-area meters cover against tenant-paid records before adding data. Keep requests and consent letters or messages. A combined utility feed does not prove every fuel or account is included. [1, 5]

    Compare resident-paid records with utility totals and common-area meters. Fill gaps without counting the same energy twice.

Denver's multifamily energy target

Denver's multifamily energy target
PeriodLimit · Site EUI · kBtu/ft²/year
Default multifamily target44.2 default

The default apartment-building site EUI target is 44.2 kBtu/ft²/year. Here, kBtu means thousands of British thermal units, a measure of energy. Check whether your building has an approved extension to the default 2030 target year. For mixed-use buildings, the target can depend on each use's share of floor area. Approved adjustments and compliance pathways can also change it. Ask Denver to check your building’s assignment. [1, 5]

Denver's payments and penalties

Example: a two-period energy shortfall

Assume a 100,000-ft² apartment building has a two-period schedule and a 5 kBtu/ft²/year shortfall. [1]

Missing energy
100,000 × 5 = 500,000 kBtu
Two-period rate
$0.23 / missing kBtu
Up to $115,000 for that target year

This uses the two-period rate before adjustments. Separate violations and missed extension deadlines can add penalties.

Missing benchmarking or verification can cost $2,000 each year for each violation. Performance fines depend on missing kBtu and the number of target periods. The maximum is $0.15 per missing kBtu for three periods, $0.23 for two, or $0.35 for one. Other rules cover missing benchmarks, extension deadlines, maintenance and small-building compliance. Appeals, reduced penalties and penalty reinvestment have deadlines and eligibility rules. [1]

Bring resident-paid usage to your reporting team.

Reconcile resident-paid usage with utility totals for your Denver energy record.

With each resident's permission, Public Grid collects actual monthly in-unit usage where property data sharing is allowed and we handle the resident's account. We export that usage for ENERGY STAR Portfolio Manager, GRESB and BPS or benchmarking reporting. You or your consultant submit the report.

Public Grid is free for owners, managers and residents. Enter your property's address to check electricity coverage.

Unit 305Active

Bills received

STATEMENTUSAGE
Sep 15, 2026Aug 14 – Sep 12471 kWh
Aug 14, 2026Jul 15 – Aug 13618 kWh

Denver FAQ

Need help with in-unit data?

Talk with our team about resident permission, usage records and reporting exports.

Book a demoExplore the blog
What is Energize Denver?

Denver's benchmarking and existing-building energy-performance program, administered by CASR. Large and small buildings have different duties. [1]

What is the Energize Denver deadline?

June 1 each year for large-building reporting; most large buildings have 2028/2032 target years. The 20,000–24,999-ft² small-building deadline is December 31, 2026. [2, 3, 4]

What is the multifamily EUI target?

The default table value is 44.2 kBtu/ft²/year; check the building's assigned adjusted target and timeline. [1, 5]

Do I need resident-paid bills?

Whole-building energy is required. Start with utility aggregation; the rules require tenant requests where utility data is unavailable. [1]

What are Energize Denver penalties?

Benchmarking has a $2,000 annual per-violation schedule. Performance calculations depend on missing kBtu and number of target periods. [1]

Does Denver compliance satisfy Colorado BPS?

Current state guidance deems qualifying Denver performance compliance, including approved adjustments and extensions, compliant with state performance targets. Both benchmarking submissions and applicable state fees remain. [7]