New York City · Article 320
Local Law 97
Covered Article 320 buildings report annual emissions against the applicable limit.
Read the guide →Official source ↗If your building is covered, you need an energy audit every ten years: a review of energy use. You also need retro-commissioning, testing and correcting how base-building systems run. A professional must assess and correct those systems. Then file an Energy Efficiency Report (EER). Yearly utility reports alone do not meet these duties. [1, 2, 3]
Last verified Nov 10, 2026 · 7 official sources
2026-cohort Energy Efficiency Report
Class 1 excluded
Same lot / same condominium board
Tax-block digit sets the regular year
Then $5,000 per additional year until you file
Registered design professional files the EER
Check both individual building size and qualifying ownership groups.
Qualifying groups over 100,000 ft² are also covered if they share a lot or condominium board. Separate systems need separate EERs. Shared base-building systems can require a group report. Special rules for co-ops and buildings across tax blocks can affect filing years and notices. [2, 3]
The EER covers an audit and retro-commissioning by qualified professionals.
The work covers the building’s envelope (its outer shell), heating, ventilation and air conditioning (HVAC), and conveying systems such as elevators. It also covers domestic hot water, electrical and lighting systems. Specific exclusions apply to tenant-owned or tenant-maintained systems. Who pays the bill alone does not decide which systems are covered. [2, 4]
The rule uses Level 2 procedures under ANSI/ASHRAE/ACCA Standard 211-2018. Generally, finish the audit and retro-commissioning no earlier than four years before filing, subject to §28-308.7. Keep required operating fixes separate from recommended capital upgrades. [2, 3]
Include the Deep Energy Retrofit Plan Analysis and show its results to the owner. Use the DOE Asset Score Audit Template and current retro-commissioning reporting tool. Send the EER to LL87@buildings.nyc.gov. Your registered design professional should check current forms and fee instructions. [1, 3, 7]
Keep audit and retro-commissioning reports for eleven years from the required filing date. Make them available if DOB asks. Save the filing confirmation too. [3]
Initial financial-hardship extension application deadline for a 2026 report. Late requests may not qualify. [3]
DOB confirms 2026 statutory deadlines; 2025 service-notice extensions do not apply to filing year 2026. [5]
DOB publishes a filing-year-2025-only extension to March 31, 2026. [6]
DOB notice clarifies EER filing by a registered design professional. [7]
LL87 enacted; current duties apply as amended. [1]
Missing-report penalties continue each year until an acceptable EER is submitted.
Assume three years of missing reports under the stated schedule. [3]
This uses the missing-report schedule for three years. Waivers, challenges, filing fees and professional costs are separate.
A missing or unacceptable EER is a Major (Class 2) violation. Fines may be $3,000 for the first year, plus $5,000 each additional year until you file. A report chosen for full review can also lead to this violation if objections remain unresolved. This applies after three revisions or two years from the first Notice of Objections, whichever comes first. Filing fees, professional fees and correction costs are separate. [3]
LL87 requires audits and retro-commissioning; LL97 separately regulates emissions. An EER does not establish that a building has met LL97's separate emissions obligations. [1, 2, 3]
Give your audit team the available usage records alongside the building's equipment and operating records.
With each resident's permission, Public Grid collects actual monthly in-unit usage where property data sharing is allowed and we handle the resident's account. We export that usage for ENERGY STAR Portfolio Manager, GRESB and BPS or benchmarking reporting. You or your consultant submit the report.
Public Grid is free for owners, managers and residents. Enter your property's address to check electricity coverage.
| STATEMENT | USAGE |
|---|---|
| Sep 15, 2026Aug 14 – Sep 12 | 471 kWh |
| Aug 14, 2026Jul 15 – Aug 13 | 618 kWh |
We can help you check electricity coverage and the resident-paid usage available for your reporting team.
Book a demoExplore the blogThe individual test is greater than 50,000 gross ft². Check grouping rules before concluding the property is outside coverage. [2]
Those statuses alone do not exempt the property, according to DOB's FAQ. Ask DOB about any applicable relief process. [4]
DOB requires filing by a registered design professional. A manager's data collection alone does not satisfy that requirement. [7]
Costs include city filing fees and property-specific professional fees. Request a property-specific proposal and check current DOB fees. [3]
Last checked November 10, 2026 · 7 official sources
Confirm your building's coverage and filing route with NYC DOB and the registered design professional filing your EER.