If your building is covered, you need an energy audit every ten years: a review of energy use. You also need retro-commissioning, testing and correcting how base-building systems run. A professional must assess and correct those systems. Then file an Energy Efficiency Report (EER). Yearly utility reports alone do not meet these duties. [1, 2, 3]

Last verified Nov 10, 2026 · 7 official sources

Next ordinary filing
Dec 31, 2026

2026-cohort Energy Efficiency Report

Individual building
>50,000 gross ft²

Class 1 excluded

Qualifying groups
>100,000 gross ft²

Same lot / same condominium board

Reporting cycle
10 years

Tax-block digit sets the regular year

First missed year
$3,000

Then $5,000 per additional year until you file

Filing professional
RDP

Registered design professional files the EER

On this page

Check your building. Confirm coverage.

Check both individual building size and qualifying ownership groups.

  1. 01

    Check area and tax classification.

    Check Department of Finance records and the current Department of Buildings (DOB) covered list. An individual building must be greater than 50,000 ft². Exactly 50,000 ft² does not qualify under that test. Class 1 is excluded. [1, 2]

  2. 02

    Check grouping and shared systems.

    Qualifying groups over 100,000 ft² are also covered if they share a lot or condominium board. Separate systems need separate EERs. Shared base-building systems can require a group report. Special rules for co-ops and buildings across tax blocks can affect filing years and notices. [2, 3]

  3. 03

    Check exceptions with DOB and the professional.

    Vacancy and landmark designation alone are not exemptions. New-building and alteration relief depends on the applicable DOB procedure. [1, 4]

Prepare the record. Complete the filing.

The EER covers an audit and retro-commissioning by qualified professionals.

  1. 01

    Confirm the covered property and due year.

    The last digit of the filing year normally matches the tax block’s last digit. Check group reporting rules and any exception before you hire a team. [1, 2, 3]

  2. 02

    Appoint qualified professionals.

    The rule sets who can do or supervise the audit and retro-commissioning. Those professionals cannot be building staff. A registered design professional must file the EER. [3, 7]

  3. 03

    Gather base-building system records.

    The work covers the building’s envelope (its outer shell), heating, ventilation and air conditioning (HVAC), and conveying systems such as elevators. It also covers domestic hot water, electrical and lighting systems. Specific exclusions apply to tenant-owned or tenant-maintained systems. Who pays the bill alone does not decide which systems are covered. [2, 4]

  4. 04

    Complete the audit, testing and required corrections.

    The rule uses Level 2 procedures under ANSI/ASHRAE/ACCA Standard 211-2018. Generally, finish the audit and retro-commissioning no earlier than four years before filing, subject to §28-308.7. Keep required operating fixes separate from recommended capital upgrades. [2, 3]

  5. 05

    Prepare and file the EER.

    Include the Deep Energy Retrofit Plan Analysis and show its results to the owner. Use the DOE Asset Score Audit Template and current retro-commissioning reporting tool. Send the EER to LL87@buildings.nyc.gov. Your registered design professional should check current forms and fee instructions. [1, 3, 7]

  6. 06

    Keep the evidence.

    Keep audit and retro-commissioning reports for eleven years from the required filing date. Make them available if DOB asks. Save the filing confirmation too. [3]

Your next deadlines

  1. December 31, 2026

    2026 EER cohort

    2026-cohort EER deadline; nonfinancial good-faith extension applications under the rule are due in the report's due year by December 31. Approval is not automatic. [3, 5]

  2. 2027 / ten-year recurrence

    2027 cohort and later recurrence

    Under the standard block-digit rule, blocks ending 7 fall in 2027; a standard 2026 cohort recurs in 2036. Grouping, deferral and current DOB notices can change the due year. [1, 2]

Past deadlines and rule changes
  1. October 1, 2026

    Initial financial-hardship extension application deadline for a 2026 report. Late requests may not qualify. [3]

  2. March 31, 2026

    Extended 2025-cohort EER deadline. This is not the 2026 cohort's deadline. [5, 6]

  3. February 27, 2026

    DOB confirms 2026 statutory deadlines; 2025 service-notice extensions do not apply to filing year 2026. [5]

  4. November 25, 2025

    DOB publishes a filing-year-2025-only extension to March 31, 2026. [6]

  5. October 15, 2021

    DOB notice clarifies EER filing by a registered design professional. [7]

  6. 2009

    LL87 enacted; current duties apply as amended. [1]

Understand the calculation. Plan your response.

Missing-report penalties continue each year until an acceptable EER is submitted.

Example; unadjusted

Assume three years of missing reports under the stated schedule. [3]

First missed year
$3,000
Two additional years
2 × $5,000
Schedule total
$3,000 + $10,000
$13,000 under the schedule

This uses the missing-report schedule for three years. Waivers, challenges, filing fees and professional costs are separate.

A missing or unacceptable EER is a Major (Class 2) violation. Fines may be $3,000 for the first year, plus $5,000 each additional year until you file. A report chosen for full review can also lead to this violation if objections remain unresolved. This applies after three revisions or two years from the first Notice of Objections, whichever comes first. Filing fees, professional fees and correction costs are separate. [3]

LL87 requires audits and retro-commissioning; LL97 separately regulates emissions. An EER does not establish that a building has met LL97's separate emissions obligations. [1, 2, 3]

Bring resident-paid usage to your reporting team.

Give your audit team the available usage records alongside the building's equipment and operating records.

With each resident's permission, Public Grid collects actual monthly in-unit usage where property data sharing is allowed and we handle the resident's account. We export that usage for ENERGY STAR Portfolio Manager, GRESB and BPS or benchmarking reporting. You or your consultant submit the report.

Public Grid is free for owners, managers and residents. Enter your property's address to check electricity coverage.

Unit 305Active

Bills received

STATEMENTUSAGE
Sep 15, 2026Aug 14 – Sep 12471 kWh
Aug 14, 2026Jul 15 – Aug 13618 kWh

Local Law 87 questions

Bring your data questions.

We can help you check electricity coverage and the resident-paid usage available for your reporting team.

Book a demoExplore the blog
Is LL87 due every year?

No. The normal EER schedule is every ten years, based on the tax block's last digit. Other NYC energy filings have separate schedules. [1, 2]

Is the 2026 deadline March 31?

No. March 31, 2026 was the extended 2025-cohort deadline. The 2026 cohort is due December 31, 2026. [5, 6]

Does an exactly 50,000-ft² building qualify?

The individual test is greater than 50,000 gross ft². Check grouping rules before concluding the property is outside coverage. [2]

Are vacant or landmark buildings exempt?

Those statuses alone do not exempt the property, according to DOB's FAQ. Ask DOB about any applicable relief process. [4]

Can a new building skip the report?

Confirm with DOB. Certain new buildings with a first temporary certificate under ten years old may qualify for relief. Confirm whether an EER or deferral application is needed; DOB’s published instructions differ. [1, 4]

Must every audit recommendation be built?

Audit recommendations do not create a blanket construction requirement. Retro-commissioning does require analysis, testing and specified corrections under the Code and rule. [2, 3]

Can the property manager file the EER?

DOB requires filing by a registered design professional. A manager's data collection alone does not satisfy that requirement. [7]

What does compliance cost?

Costs include city filing fees and property-specific professional fees. Request a property-specific proposal and check current DOB fees. [3]

GET STARTED

Check your property’selectricity coverage.

Enter your property’s address to check electricity service.