Maryland BEPS
for apartment buildings

Check whether your building must report its energy use each year. Maryland covers most buildings at least 35,000 gross square feet, with some exemptions. From 2030, owners must also meet net direct emissions standards. These set limits on the greenhouse gases counted under the law. [1, 2, 6]

Last verified Nov 10, 2026 · 11 official sources

Who is covered

≥35,000 gross ft²[1, 2, 3, 4]

Main duty

Benchmark and improve[2, 5, 6, 7]

Next deadline

June 1, 2027[5]

First standards

2030[6]

Final net direct standard

Zero from 2040[6]

Verification

2026 / 2031 / every 5 years[5]

On this page

Which buildings does Maryland cover?

The Maryland Department of the Environment (MDE) runs the state program.

  1. 01

    Check location, size and building groups.

    Check the 35,000-ft² size threshold without garage area. Some buildings count together under the rule's conditions. These can include condos with the same board. Buildings that share an electric or gas meter, or heating or cooling systems, can also qualify. Use their combined area when the rule requires it. Campus-level compliance is a separate option. [3, 4]

  2. 02

    Check exceptions and the current guidance.

    MDE lists several types of property for its exemption process. These include agricultural, hospital, K–12, manufacturing, federal, demolished and undersized properties. Individually designated historic properties are also listed. Being in a historic district alone does not count as an individual designation. [1, 2, 3, 4]

  3. 03

    Check the building in MDE's BEPS Portal.

    The public hub explains coverage and how to seek an exemption. It also shares 2025 disclosure data. If your building is in Montgomery County, ask county DEP for guidance. MDE's current guide says these buildings do not have to take part in the statewide program. [1, 2]

Prepare your Maryland filing

  1. 01

    Check the property you need to report.

    Check your building ID, floor area, uses, grouping and covered status. Also check the baseline, the year used to measure later changes. Existing buildings normally use 2025. New buildings use their first full occupied calendar year. [2, 3]

  2. 02

    Gather all energy records.

    Include electricity, natural gas, delivered fuels and district energy. District energy is heating or cooling supplied from outside your building. Include tenant spaces with their own meters. Leave out only what the rules allow, and keep a record of each exclusion. [2, 3]

  3. 03

    Prepare Portfolio Manager and quality checks.

    Enter property uses and monthly energy use in Portfolio Manager, the energy reporting tool. Run all data-quality checks and fix errors. If you receive notice of an error, correct it and send an updated report within 30 days. [2, 5]

  4. 04

    Have a third party check the data when due.

    Existing buildings need a third party to check reports for 2025/2030/2035/2040. Those checked reports are due in 2026/2031/2036/2041, then every five years. New buildings need their first report checked. Provide bills, delivered-fuel receipts and supporting records. [5]

  5. 05

    Send your MDE report and pay the fee.

    Follow MDE's current guide to share your property and report. Complete the BEPS Portal forms that apply and pay the yearly reporting fee. The 2026 fee is $100. From 2027, the $100 fee is adjusted for inflation, so future bills can change. [2, 5]

  6. 06

    Keep records and plan to meet the standards.

    Keep records for at least five years. Before a buyer signs the contract, transfer the required benchmarking, verification and compliance records. From 2030, check yearly net direct emissions against your building's standard. A reporting receipt alone does not show that you meet the standard. [3, 6]

Your next deadlines

  1. June 1, 2027

    Annual reporting and fee

    Report 2026 energy use and pay the fee, adjusted for inflation. [5]

  2. January 1, 2030

    First net direct emissions period

    The first period of yearly interim net direct emissions standards begins. [6]

  3. June 1, 2031

    Verified 2030 report

    The checked 2030 report is due. Affordable housing can start applying for reduced alternative compliance payments (ACPs). Applications follow the yearly June 1 schedule. [3, 5]

  4. January 1, 2035 / January 1, 2040

    Later emissions standards

    The second interim period starts in 2035. The final period, requiring zero net direct emissions, starts in 2040. [6]

Past deadlines and rule changes
  1. June 1, 2026

    2025 verified report and $100 annual reporting fee. [5]

  2. January 1–December 31, 2025

    Existing buildings normally use 2025 as their baseline and data year. The report is checked in 2026. [3, 5]

  3. October 1, 2025

    HB49 generally takes effect, though some sections have their own rules. MDE lists this as the program-change date. [4, 9]

  4. May 25, 2025

    HB49 became law as Chapter 844. Its legislative record sets out the newer exceptions and changes. [4]

Build a complete energy record

  1. 01

    Request whole-building totals

    Ask utilities to confirm which meters their totals include. Five or more tenants need no individual authorization; fewer than five brings consent rules. A departing tenant who has not explicitly refused consent need not authorize. Count tenants, not meters. Include gross grid electricity where the building has on-site renewables.[3, 8]

  2. 02

    Include resident-paid energy

    Include resident-paid energy and all fuels. Tenants must supply otherwise unavailable requested details within 30 days. Collect delivered-fuel records separately; district providers supply prior-year factors by March 1.[3]

  3. 03

    Reconcile each meter once.

    Check each meter against the totals so you count its energy once. Electricity belongs in the energy and energy use intensity (EUI) record. Purchased electricity is separate from on-site combustion; net direct emissions also count specified district heating and cooling, with allowed exclusions.[3, 6]

Maryland's net direct emissions standards

Maryland's net direct emissions standards
PeriodLimit · Net direct emissions · kg CO2e/ft²/year
2030–20340.82
2035–20390.41
2040 onward0

For mixed-use buildings, each use's floor area helps set the multifamily net direct emissions standard. Purchased electricity stays in your energy report but does not count as fuel burned on-site. The numeric energy use intensity (EUI) subsection is Reserved: it sets no numeric limit. Ask MDE about any future energy-use standard before you plan your work. [3, 6]

Maryland's annual base payment rates

Maryland's annual base payment rates
YearBase rate
2030$230
2031$234
2032$238
2033$242
2034$246
2035$250
2036$254
2037$258
2038$262
2039$266
2040$270

The base rates use 2020 dollars for each excess metric ton CO2e. They are adjusted for inflation, so they do not set a fixed future bill. [7]

Maryland's payments and penalties

Example: 18 excess metric tons

Take a 100,000-ft² apartment building with 2030 net direct emissions of 1.00 kg CO2e/ft²/year. Its standard is 0.82. [6, 7]

Excess intensity
1.00 − 0.82 = 0.18 kg CO2e/ft²/year
Excess metric tons
0.18 × 100,000 ÷ 1,000 = 18
2030 base alternative payment
18 × $230
$4,140 in 2020 dollars, before inflation

Base alternative compliance payment: $4,140 in 2020 dollars. Apply the required inflation adjustment for the compliance year. Enforcement penalties are separate.

An alternative compliance payment (ACP) lets you pay for emissions above the limit. The rates above use 2020 dollars per excess metric ton CO2e, adjusted for inflation. After 2040, the base rate rises by $4 each year, still adjusted for inflation. If the building sells, the owner on December 31 is responsible for that year's compliance and any payments due. [7]

Separate laws also allow enforcement. Under §2-610, circuit-court action can bring civil penalties up to $25,000 per violation per day. Under §2-610.1, administrative penalties can reach $2,500 per violation, with a $50,000 cap per hearing. Notice and process rules apply. These are the highest amounts allowed by those laws, rather than automatic BEPS fines. [10, 11]

Check relief and other ways to meet the rules

You can use an ACP instead of meeting the net-direct standard. Yearly exemption requests can cover documented financial distress, full-year nonoccupancy or demolition. Baseline exemptions have occupancy tests and a three-year outer limit. Eligible affordable housing can seek reduced ACPs with proof of good-faith efforts. Approval lasts one year, and you must still benchmark. Eligible campuses have their own reporting rules and standards weighted by area. [3, 7]

Confirm hospital or county-program treatment with MDE under its current guidance. Ask which certification or waiver applies to your property before relying on an exemption. [2, 4, 9]

Bring resident-paid usage to your reporting team.

Build the full energy record for Maryland reporting, including electricity that is separate from the net direct emissions calculation.

With each resident's permission, Public Grid collects actual monthly in-unit usage where property data sharing is allowed and we handle the resident's account. We export that usage for ENERGY STAR Portfolio Manager, GRESB and BPS or benchmarking reporting. You or your consultant submit the report.

Public Grid is free for owners, managers and residents. Enter your property's address to check electricity coverage.

Unit 305Active

Bills received

STATEMENTUSAGE
Sep 15, 2026Aug 14 – Sep 12471 kWh
Aug 14, 2026Jul 15 – Aug 13618 kWh

Maryland FAQ

Need help with in-unit data?

Talk with our team about resident permission, usage records and reporting exports.

Book a demoExplore the blog
What is Maryland BEPS?

MDE runs the program. It requires yearly benchmarking, which means measuring and reporting energy use. It also sets net direct building-emissions standards from 2030. [1, 6]

What buildings are covered?

Qualifying commercial, multifamily and State buildings at least 35,000 ft² are covered, excluding garages. Some groups of buildings also count. Exceptions apply. [3]

When is Maryland benchmarking due?

Reports are due each June 1. The report for 2026 is normally due June 1, 2027. Verification has a separate schedule. [5]

Does Montgomery County file twice?

MDE's current guidance directs Montgomery County buildings to county DEP instead of the statewide program. Ask MDE and DEP about your county duties and any certification or waiver that applies. [2, 4, 9]

What are Maryland's multifamily emissions limits?

0.82 kg CO2e/ft²/year in 2030–2034; 0.41 in 2035–2039; zero from 2040. [6]

Are apartment electric bills included?

Yes. Whole-building energy includes tenant meters. Purchased electricity and fuel burned on-site play different roles in the net-direct calculation. [3, 8]