County and state requirements
Montgomery County BEPS
County buildings follow DEP's county requirements under current guidance. Confirm any applicable certification or waiver with MDE and DEP.
Read the guide →Official source ↗Check whether your building must report its energy use each year. Maryland covers most buildings at least 35,000 gross square feet, with some exemptions. From 2030, owners must also meet net direct emissions standards. These set limits on the greenhouse gases counted under the law. [1, 2, 6]
Last verified Nov 10, 2026 · 11 official sources
The Maryland Department of the Environment (MDE) runs the state program.
Check the 35,000-ft² size threshold without garage area. Some buildings count together under the rule's conditions. These can include condos with the same board. Buildings that share an electric or gas meter, or heating or cooling systems, can also qualify. Use their combined area when the rule requires it. Campus-level compliance is a separate option. [3, 4]
MDE lists several types of property for its exemption process. These include agricultural, hospital, K–12, manufacturing, federal, demolished and undersized properties. Individually designated historic properties are also listed. Being in a historic district alone does not count as an individual designation. [1, 2, 3, 4]
The public hub explains coverage and how to seek an exemption. It also shares 2025 disclosure data. If your building is in Montgomery County, ask county DEP for guidance. MDE's current guide says these buildings do not have to take part in the statewide program. [1, 2]
Existing buildings need a third party to check reports for 2025/2030/2035/2040. Those checked reports are due in 2026/2031/2036/2041, then every five years. New buildings need their first report checked. Provide bills, delivered-fuel receipts and supporting records. [5]
Keep records for at least five years. Before a buyer signs the contract, transfer the required benchmarking, verification and compliance records. From 2030, check yearly net direct emissions against your building's standard. A reporting receipt alone does not show that you meet the standard. [3, 6]
Report 2026 energy use and pay the fee, adjusted for inflation. [5]
The first period of yearly interim net direct emissions standards begins. [6]
The second interim period starts in 2035. The final period, requiring zero net direct emissions, starts in 2040. [6]
Ask utilities to confirm which meters their totals include. Five or more tenants need no individual authorization; fewer than five brings consent rules. A departing tenant who has not explicitly refused consent need not authorize. Count tenants, not meters. Include gross grid electricity where the building has on-site renewables.[3, 8]
Include resident-paid energy and all fuels. Tenants must supply otherwise unavailable requested details within 30 days. Collect delivered-fuel records separately; district providers supply prior-year factors by March 1.[3]
Check each meter against the totals so you count its energy once. Electricity belongs in the energy and energy use intensity (EUI) record. Purchased electricity is separate from on-site combustion; net direct emissions also count specified district heating and cooling, with allowed exclusions.[3, 6]
| Period | Limit · Net direct emissions · kg CO2e/ft²/year |
|---|---|
| 2030–2034 | 0.82 |
| 2035–2039 | 0.41 |
| 2040 onward | 0 |
For mixed-use buildings, each use's floor area helps set the multifamily net direct emissions standard. Purchased electricity stays in your energy report but does not count as fuel burned on-site. The numeric energy use intensity (EUI) subsection is Reserved: it sets no numeric limit. Ask MDE about any future energy-use standard before you plan your work. [3, 6]
| Year | Base rate |
|---|---|
| 2030 | $230 |
| 2031 | $234 |
| 2032 | $238 |
| 2033 | $242 |
| 2034 | $246 |
| 2035 | $250 |
| 2036 | $254 |
| 2037 | $258 |
| 2038 | $262 |
| 2039 | $266 |
| 2040 | $270 |
The base rates use 2020 dollars for each excess metric ton CO2e. They are adjusted for inflation, so they do not set a fixed future bill. [7]
Take a 100,000-ft² apartment building with 2030 net direct emissions of 1.00 kg CO2e/ft²/year. Its standard is 0.82. [6, 7]
Base alternative compliance payment: $4,140 in 2020 dollars. Apply the required inflation adjustment for the compliance year. Enforcement penalties are separate.
An alternative compliance payment (ACP) lets you pay for emissions above the limit. The rates above use 2020 dollars per excess metric ton CO2e, adjusted for inflation. After 2040, the base rate rises by $4 each year, still adjusted for inflation. If the building sells, the owner on December 31 is responsible for that year's compliance and any payments due. [7]
Separate laws also allow enforcement. Under §2-610, circuit-court action can bring civil penalties up to $25,000 per violation per day. Under §2-610.1, administrative penalties can reach $2,500 per violation, with a $50,000 cap per hearing. Notice and process rules apply. These are the highest amounts allowed by those laws, rather than automatic BEPS fines. [10, 11]
You can use an ACP instead of meeting the net-direct standard. Yearly exemption requests can cover documented financial distress, full-year nonoccupancy or demolition. Baseline exemptions have occupancy tests and a three-year outer limit. Eligible affordable housing can seek reduced ACPs with proof of good-faith efforts. Approval lasts one year, and you must still benchmark. Eligible campuses have their own reporting rules and standards weighted by area. [3, 7]
Confirm hospital or county-program treatment with MDE under its current guidance. Ask which certification or waiver applies to your property before relying on an exemption. [2, 4, 9]
Build the full energy record for Maryland reporting, including electricity that is separate from the net direct emissions calculation.
With each resident's permission, Public Grid collects actual monthly in-unit usage where property data sharing is allowed and we handle the resident's account. We export that usage for ENERGY STAR Portfolio Manager, GRESB and BPS or benchmarking reporting. You or your consultant submit the report.
Public Grid is free for owners, managers and residents. Enter your property's address to check electricity coverage.
| STATEMENT | USAGE |
|---|---|
| Sep 15, 2026Aug 14 – Sep 12 | 471 kWh |
| Aug 14, 2026Jul 15 – Aug 13 | 618 kWh |
Talk with our team about resident permission, usage records and reporting exports.
Book a demoExplore the blogQualifying commercial, multifamily and State buildings at least 35,000 ft² are covered, excluding garages. Some groups of buildings also count. Exceptions apply. [3]
Reports are due each June 1. The report for 2026 is normally due June 1, 2027. Verification has a separate schedule. [5]
0.82 kg CO2e/ft²/year in 2030–2034; 0.41 in 2035–2039; zero from 2040. [6]
Last checked November 10, 2026 · 11 official sources
Confirm your building's coverage and filing route with the Maryland Department of the Environment.