County and state requirements
Maryland BEPS
Current guidance directs Montgomery County buildings to DEP for county benchmarking and BEPS. Confirm any property-specific state certification or waiver with DEP and MDE.
Read the guide →Official source ↗Check your building's assigned energy target or accepted improvement plan. Montgomery County covers most buildings at least 25,000 gross square feet. Owners must report energy use each year and meet their assigned performance standard or an accepted plan. [1, 2, 3, 4, 5, 6, 7]
Last verified Nov 10, 2026 · 8 official sources
Montgomery County’s Department of Environmental Protection (DEP) runs the county program.
Some structures count together if they share energy meters, heating or cooling systems, or indoor common areas. Independent spaces may be treated differently. These have their own meters and systems, with no connected indoor space. [1, 3]
Multifamily buildings of 250,000 ft² and above are Group 4. Those from 25,000 to below 250,000 ft² are Group 5. Check your exact group in DEP's inventory. Its table uses shortened ranges that overlap. Some mainly industrial/process, infrastructure and open public-assembly uses may qualify for exemption. [1, 3]
Include tenant spaces, common areas, all fuels and energy generated on-site. Request combined utility totals, called aggregates, early. [4]
Your first report, then every third year, needs a check by a verifier with a recognized credential. Check your building's verification year. Choose someone whose credential DEP recognizes. [1]
Keep your underlying Portfolio Manager record and fix any flagged issues. You must also complete the County submission. Creating the property record alone is not enough. [1]
The performance path uses energy from the evaluation calendar year. Report it by June 1 the next year. If you need a BPIP, it is due 90 days before that June 1 deadline. It needs a qualified ASHRAE Level 2 audit, cost-effective measures and a schedule for doing the work. [2]
Annual waiver application, on the annual schedule; not an automatic extension. [1]
HB49/Chapter 844 general effective date; state-law certification/waiver mechanism for qualifying county programs. [8]
Council approved Executive Regulation 17-23AM. [7]
Bill effective, ninety days after signing. [7]
Executive signed Bill 16-21. [7]
County Council passed Bill 16-21. [7]
DEP requires monthly energy use from both common-area and tenant meters. Include electricity, gas, fuel oil or diesel, delivered fuels and renewable generation where they apply. County benchmarking does not require water or waste meters. DEP says five or more meters can qualify for combined data without tenant permission. Four or fewer requires tenant permission. Utility rules count tenants and accounts differently. For example, Potomac Edison has a fewer-than-five-tenant rule. Ask your utility which count applies. [4]
Pepco and BGE use EUDS. Washington Gas uses its Benchmarking Portal and needs gas meter numbers. Potomac Edison uses FirstEnergy's benchmarking tool. Its UBID is different from the County ID. Some data arrives quickly, but DEP warns requests can take 3–4 weeks or longer near deadlines. Cover every calendar day, which sometimes needs thirteen bills. Report on-site solar, parking and EV energy correctly so DEP can make the right adjustments. [4]
Compare resident-paid records with utility totals and common-area meters. Fill gaps without counting the same energy twice.
| Rule | Value |
|---|---|
| Normalized net site EUI | 37 kBtu/ft²/year |
The type-table value of 37 is not every apartment building's assigned target. Mixed-use floor areas can change the final standard. The required drop from baseline is also capped at 30%. Group 4 evaluates in 2030/2035; Group 5 in 2031/2036. Reports are due the following June. Ask DEP to confirm your group if you are at a size boundary. [2, 3, 6]
Assume an apartment building gets one initial citation and two repeat citations. This example assumes three citations. It does not assume an automatic fine each day. [5]
This assumes one initial and two repeat citations. Court remedies and other sanctions are separate.
DEP's current guidance lists Class A civil fines: $500 for an initial violation and $750 for a repeat. Each day a violation continues is a separate offense. A citation may seek an abatement order, a court order to fix the problem. Further court sanctions can follow. State law allows higher penalties, but that does not create a new local schedule. DEP says the County Council would need to adopt changes. [5]
Reach the building-specific adjusted standard and continue annual reporting. [3]
Some designated building types use the program's ten-year measure-payback rule. This rule concerns how long energy savings take to cover an improvement's cost. It includes affordable housing, common-ownership communities, rent-stabilized multifamily, nonprofit and local small-business buildings. These types are not automatically exempt. A second BPIP for the final deadline has another condition. You must complete specified first-plan measures with payback of five years or less. [2, 7]
Benchmark exemptions and yearly waivers are different. An exemption can remove covered status. Waivers for financial distress, qualifying occupancy, new construction or demolition last one year. Apply by May 1. You can also apply for an extension up to thirty days beyond June 1. Further extensions may be considered for documented extenuating circumstances. [1]
Include resident-paid usage in the whole-building record used for county benchmarking and performance reporting.
With each resident's permission, Public Grid collects actual monthly in-unit usage where property data sharing is allowed and we handle the resident's account. We export that usage for ENERGY STAR Portfolio Manager, GRESB and BPS or benchmarking reporting. You or your consultant submit the report.
Public Grid is free for owners, managers and residents. Enter your property's address to check electricity coverage.
| STATEMENT | USAGE |
|---|---|
| Sep 15, 2026Aug 14 – Sep 12 | 471 kWh |
| Aug 14, 2026Jul 15 – Aug 13 | 618 kWh |
Talk with our team about resident permission, usage records and reporting exports.
Book a demoExplore the blogYes. Most buildings at least 25,000 gross ft² are covered. Large and smaller multifamily buildings have separate evaluation groups. [3]
DEP generally says five or more meters can use combined totals without permission. Smaller counts need permission. Check your utility's counting rule. [4]
Last checked November 10, 2026 · 8 official sources
Confirm your building's coverage and filing route with Montgomery County DEP.
Building law directory →In-unit energy data →Maryland BEPS →GET STARTED
Enter your property’s address to check electricity service.