City and state requirements
Seattle BEPS
Buildings in Seattle also need to check the City's annual benchmarking and phased emissions requirements. State filing does not replace those duties.
Read the guide →Official source ↗File by July 1, 2027 and put energy-management and maintenance plans into practice. Washington's Tier 2 includes multifamily buildings over 20,000 square feet. [1, 2, 3, 4, 5, 6]
Last verified Nov 10, 2026 · 7 official sources
Washington Commerce runs the state program.
For Tier 2, your QEM calculates and reports the energy use intensity target (EUIt) that applies. They can use an allowed national median instead. Implement the energy management plan (EMP) and operations and maintenance (O&M) program. Tier 2 uses the target for comparison and does not currently have to reach it. Tier 1 follows its chosen performance pathway. [2, 3, 4]
Include the required forms and reporting tools for energy management and maintenance plans. An energy export alone is not enough. Tier 2 reports July 1, 2027, then every five years. Tier 1 reports on its group's dates, also every five years. [2, 3, 4, 5]
Collect monthly energy for all fuels, plus building uses and floor area for benchmarking and EUIt. RCW §19.27A.170(8) requires electric and gas utilities to give covered owners combined monthly energy data on request. Prior tenant consent is not required. Personally identifying details and customer-specific billing information stay protected. The law also covers utilities outside its qualifying-utility category. They must provide a compatible electronic document or upload service. Under subsection (7), data is due within sixty days of a written or electronic request and authorization. [7]
Include resident-paid energy alongside common-area usage. Check which fuels and accounts are in the utility totals.
Compare resident-paid records with utility totals and common-area meters. Fill gaps without counting the same energy twice.
Multifamily/Tier 2 currently has no required numeric performance limit. Tier 1's EUIt is a target for energy used at the building per square foot each year. Its unit is kBtu/ft²/year. One kBtu is 1,000 British thermal units, a measure of energy. It is calculated for the building's activities and the adjustments that apply. [2, 3, 4]
Assume a 100,000-gross-ft² all-multifamily apartment building faces the Tier 2 maximum penalty. [3, 4]
This is the Tier 2 maximum per compliance period. Late interest and collection charges are separate.
Tier 2 Annex Y5 starts with a notice of violation/opportunity to correct/intent to assess (NOVCI). You have at least 30 calendar days to respond. Failing to respond can lead to a final order and loss of hearing rights. The maximum is $0.30/gross ft² per compliance period. Successful, timely compliance or a successful, timely challenge can waive fines. Late interest and collection rules are separate. Under the rule's conditions, owners cannot pass penalties to cooperating tenants. [4]
Tier 1 Annex Z5 sets a base maximum of $5,000. It adds an amount based on duration, capped at $1/ft²/year. An 18-month cap on accrued penalties applies if you choose the maximum fine. It also applies if mitigation is unsuccessful by the next compliance date. This explains the agency's shorthand of $5,000 + $1.50/ft². Successful documented mitigation can reduce the assessment. Its ceiling is 30% of $5,000 plus $0.20/ft²/year, accrued daily. Late-payment rules after 180 days, interest and collection can add costs. Check the rule for exact notices, dates and order. [2, 4]
Tier 1 offers several current paths. You can meet EUIt or use investment criteria: an ASHRAE Level 2 audit and cost-effective measures. Other paths require at least a 15% weather-normalized EUI drop or qualifying recent space-heating electrification. Weather-normalized means adjusted for weather differences. Each path has detailed conditions. They are not interchangeable exemptions. [2, 4]
Exemptions differ by tier. Possible exemptions cover certain occupancy conditions and unconditioned space, meaning space without heating or cooling. Others cover qualifying manufacturing or agricultural uses, demolition, financial hardship and national-security circumstances. Check the rule for required proof. It also explains how an exemption applies to only part of a building. Tier 2 generally requires an exemption request at least six months before compliance. You can apply for extensions from six months before to six months after the date that applies. Approved extensions generally last two years. Applying does not mean approval. Ask Commerce about the process using its current instructions for your tier. [2, 3, 4, 5, 6]
Bring available in-unit usage into your Tier 2 whole-building energy record.
With each resident's permission, Public Grid collects actual monthly in-unit usage where property data sharing is allowed and we handle the resident's account. We export that usage for ENERGY STAR Portfolio Manager, GRESB and BPS or benchmarking reporting. You or your consultant submit the report.
Public Grid is free for owners, managers and residents. Enter your property's address to check electricity coverage.
| STATEMENT | USAGE |
|---|---|
| Sep 15, 2026Aug 14 – Sep 12 | 471 kWh |
| Aug 14, 2026Jul 15 – Aug 13 | 618 kWh |
Talk with our team about resident permission, usage records and reporting exports.
Book a demoExplore the blogYes; covered multifamily over 20,000 ft² is Tier 2. [3]
Tier 2 currently requires comparison reports and energy management and maintenance plans. You do not have to reach a performance target. [3]
No prior tenant consent is required for covered-building aggregate data. Current law requires electric and gas utilities to provide combined data on request. Privacy protections apply. [7]
Last checked November 10, 2026 · 7 official sources
Confirm your building's coverage and filing route with Washington Commerce.
Building law directory →In-unit energy data →Seattle BEPS →GET STARTED
Enter your property’s address to check electricity service.